Electricity and Water Supply
The client and adjoining neighbours shall supply electricity and water at all times during construction. This will be the most convenient supply location to the contractor. In the event that power and water are not supplied any extra cost incurred including generator hire, cartage, loss of time or additional labour shall be charged on the quote.
Site
The quotation for fencing is, unless noted, based on construction of clear unobstructed areas. Unless otherwise provided in the quote, the client and adjoining neighbours shall clear all obstructions and provide a clear working area and access. If obstructions have failed to be removed then all costs for removal including equipment hire and labour shall be payable by the person(s) responsible. If work cannot begin on the day due to obstructions, additional charges may apply.
The client shall be responsible for locating and notifying Inspired Fencing at the time of construction of the position of all underground obstructions including electrical and telephone cables, gas, water, storm water and sewerage pipes, and any other service facilities which are, or may be, affected by the construction and shall indemnify Inspired Fencing and its contractors against any claims or demands made by any person or authority in respect of any damage.
No allowance has been made for concealed obstructions such as but not limited to rock, wires, pipes, tree roots, broken posts, foundations, thick or reinforced concrete, etc., which may be encountered. Any costs incurred in the removal of concealed obstructions including additional labour may be added to the quote.
The client shall remove or protect all plants, ornaments, etc., which may be damaged during construction. Although the contractor shall exercise all care, Inspired Fencing will accept no responsibility.
Permits
In the event that a permit is required for services, it is the responsibility of the client to apply for and be granted a permit and give a copy to the contractor. If a permit has not been supplied to the contractor prior to commencement of services, it will be assumed that a permit was granted and Inspired Fencing take no responsibility if this is not the case.